Precautions for low price horizon group quartz slab processing plane joints
- Categories:horizon group quartz slab
- Author:
- Origin:
- Time of issue:2022-06-07
- Views:0
(Summary description)Before splicing low price horizon group quartz slabs, check whether the splicing surface of the splicing slab is straight and consistent.
Precautions for low price horizon group quartz slab processing plane joints
(Summary description)Before splicing low price horizon group quartz slabs, check whether the splicing surface of the splicing slab is straight and consistent.
- Categories:horizon group quartz slab
- Author:
- Origin:
- Time of issue:2022-06-07
- Views:0
1. Before splicing low price horizon group quartz slabs, check whether the splicing surface of the splicing slab is straight and consistent. If the splicing interface is not straight and consistent, there will be glue marks on the splicing, which will affect the quality of the splicing and the seamless splicing. of perfection. The simple way to ensure that the interface is consistent is to first place the two panels to be spliced on the same plane, make the two sides to be spliced as close as possible, fix them with F clips, and then use a positioning guide to fix them in the proper position, and use a gong machine at the same time. Cut the two sides to be spliced to obtain a flat and uniform splicing interface.

2. In order to make the front and upper end of the low price horizon group quartz slab splicing joint tight and seamless, use 120# sandpaper to wipe the front 2mm-3mm of the splicing joint, then clean the joint with alcohol or Tianna water, and then check the joint. Whether it is even.
3. At the front splicing edge of the two panels to be spliced, use instant bonding to fix the splicing with small blocks. The number of fixed small blocks and the distance from the splicing edge should be adjusted according to the area of splicing and the selection of fastening tools. Certainly.
4. Put the prepared two boards on the same plane, and then stick a single-sided tape under the splicing interface to prevent the glue from dripping during splicing. Leave a 3mm gap between the two boards to ensure that when splicing Effectively control the glue, so that the glue at the splicing interface can be fully accommodated.
5. Pour the prepared glue evenly on the splicing interface. The amount of glue accounts for more than 1/2 of the reserved gap. Then fasten the spliced board surface with F clip or A clip as soon as possible, and check carefully when tightening. Check whether the spliced surface is flat, if not, use a rubber hammer to lightly hammer it higher than the board surface until it is completely flat.
6. During the curing time of the glue, all the fixtures should not be loosened or moved at will, and no one should stand on the table or place other heavy objects, otherwise it will seriously affect the quality of the splicing.
7. After the glue is cured, remove the excess glue with a gong machine or an angle grinder, and then use a grinder to smooth it. Never use a chisel to chisel the shovel, otherwise it will affect the quality of the Low price horizon group quartz slab splicing surface and appearance, and even collapsed, leaving hidden dangers.
Scan the QR code to read on your phone
ALL PRODUCTS
Message
News
Contact Us
Message
Copyright © Lanling Jinzhao New Material Co., Ltd. 鲁ICP备14031016号
